Architecture (non-thesis) | |||||
Master | TR-NQF-HE: Level 7 | QF-EHEA: Second Cycle | EQF-LLL: Level 7 |
Course Code: | MIM509 | ||||||||
Course Name: | Project and Construction Management | ||||||||
Course Semester: | Fall | ||||||||
Course Credits: |
|
||||||||
Language of instruction: | TR | ||||||||
Course Requisites: | |||||||||
Does the Course Require Work Experience?: | No | ||||||||
Type of course: | Department Elective | ||||||||
Course Level: |
|
||||||||
Mode of Delivery: | Face to face | ||||||||
Course Coordinator : | Ar.Gör. İREM YERGÜN | ||||||||
Course Lecturer(s): | |||||||||
Course Assistants: |
Course Objectives: | The main objective of this course is to teach advanced Project Management topics in compliance with “Building Information Management” standards, Tools and techniques for “Analysis and synthesis of information, organization, asset and project requirements”, “Information Modelling”, “People and process interoperability and the common data environment (CDE)”, “Integrated Project Delivery” are given according to the recommendations of relevant buildingSMART and The ISO 19650 series standards. |
Course Content: | What is a Project? Technology supported Project Management. Modelling, information modelling and Project Information Models. “Building Information Management (BIM)”. Building as an “Asset” and building construction as a set of interoperability solutions including people, processes and data. Standards and tools for use in an interoperable Project Management Environment. Relationships between and ontology of common data environment and Project Information Model. |
The students who have succeeded in this course;
|
Week | Subject | Related Preparation |
1) | What is a Project? Definition of key concepts, nine knowledge domains of “Project Management Profession” | The Project Management Body of Knowledge Book (PMI) |
2) | Introduction to Integrated Project Delivery. The “interoperability” concept. Building Information Management (BIM), what, why and how?. Open standards for ICT enabled Project Management | buildingSMART web site, ISO 19650 |
3) | What is a Model? Information Modeling. Tools and techniques for information modeling. Definition of keywords: “Ontology” & “Semantics”. Construction Information Management Fundamentals. | OMG, UML Specification. Integrated DEFinition Methods (IDEF) Specifications |
4) | "İhtiyaçları - gereksinimleri anlamak". Organizasyonel ihtiyaçlar, Bilgi gereksinimleri, Varlık (Değer) gereksinimleri, Proje gereksinimleri. Bilgi ve verilerin sınıflandırılması. Mevcut durumun (AS-IS) tespiti, iyileştirme (TO-BE) önerileri | buildingSMART web site, ISO 19650, OMG, UML Specification. |
5) | Temin ve inşaat planlaması ile "Bilgi Üretimi" ve "Bilgi Sunumu / Paylaşımı" planlaması arasındaki bağıntıların irdelenmesi. | PMI Body of Knowledge, buildingSMART web site, ISO 19650, |
6) | Collaborative production and sharing of (asset: building and construction process) information during Project Management. Utilization of Common Data Environment (CDE) | PMI Body of Knowledge, buildingSMART web site, ISO 19650, |
7) | Mid-Term Examination | Course Notes |
8) | Online and open source tools for Asset and Project Information Management | Relevant Cloud Resources |
9) | Classwork / Homework: Primavera Project Planner Professional Versions 8.2 - 16.1, introduction, elements of the interface | Primavera Project Planner User Manual and Course Notes |
10) | P6 Professional, Defining a WBS (Work Breakdown Structure) for the project, Adding new activities, Creating relationships between activities | P6 Professional User Manual, Relevant course notes |
11) | P6 Professional, Resource analysis and adding resources to the project | P6 Professional User Manual, Relevant course notes |
12) | P6 Professional, Activity Codes, Excel templates and populating detailed work programs, designing a Building Information Model | Relevant course notes |
13) | Basic Building Information Management with P6 Professional, examples to some basic reports | Relevant course notes |
14) | Utilizing online tools, general discussion on course topics and defining the integrity of topics and tools. | Relevant course notes |
Course Notes / Textbooks: | 1. The Project Management Body of Knowledge Book (PMI) 2. buildingSMART Standards: https://www.buildingsmart.org/standards/bsi-standards/ 3. ISO 19650-I, ISO 19650-II 4. British Standards and Publicly Available Specifications (PAS) from BSI: https://bim-level2.org/en/standards/ 5. Integrated DEFinition Methods (IDEF) Specifications: https://www.idef.com/idefo-function_modeling_method/ 6. UML (Unified Modeling Language) The Object Managemet Group: https://www.uml.org/index.htm |
References: | 1. The Project Management Body of Knowledge Book (PMI) 2. buildingSMART Standards: https://www.buildingsmart.org/standards/bsi-standards/ 3. ISO 19650-I, ISO 19650-II 4. British Standards and Publicly Available Specifications (PAS) from BSI: https://bim-level2.org/en/standards/ 5. Integrated DEFinition Methods (IDEF) Specifications: https://www.idef.com/idefo-function_modeling_method/ 6. UML (Unified Modeling Language) The Object Managemet Group: https://www.uml.org/index.htm |
Learning Outcomes | 1 |
2 |
4 |
3 |
5 |
---|---|---|---|---|---|
Program Outcomes |
No Effect | 1 Lowest | 2 Low | 3 Average | 4 High | 5 Highest |
Program Outcomes | Level of Contribution |
Homework | |
Observation | |
Presentation | |
Reporting | |
Bilgisayar Destekli Sunum |
Semester Requirements | Number of Activities | Level of Contribution |
Attendance | 14 | % 10 |
Application | 6 | % 15 |
Presentation | 1 | % 15 |
Midterms | 1 | % 20 |
Final | 1 | % 40 |
total | % 100 | |
PERCENTAGE OF SEMESTER WORK | % 60 | |
PERCENTAGE OF FINAL WORK | % 40 | |
total | % 100 |
Activities | Number of Activities | Duration (Hours) | Workload |
Course Hours | 7 | 3 | 21 |
Application | 6 | 3 | 18 |
Study Hours Out of Class | 14 | 2 | 28 |
Presentations / Seminar | 1 | 24 | 24 |
Homework Assignments | 6 | 6 | 36 |
Midterms | 1 | 2 | 2 |
Paper Submission | 1 | 36 | 36 |
Final | 1 | 2 | 2 |
Total Workload | 167 |